📈 Solar & electronics ERP: Yield & testing
Every test result linked to the unit's serial: first-pass and rolled throughput yield, flash tests that set each module's power class, control charts that warn before parts drift out, and burn-in that catches early failures.
A simplified I-V curve for a 550 Wp class module. Change irradiance and cell temperature to see power and the bin. Illustrative model.
Output voltage at functional test, one point per batch of five. Press Play to stream it. Points breaking a rule turn red. Demo data.
Target 10.00 V, control limits 9.91 to 10.09 V.
The bathtub curve: failure rate over a product's life. Longer burn-in screens more early failures but costs chamber time. Illustrative.
What each one asks of the test team, and where it's handled.
Nine capabilities, each linked to the related module.
Send us a week of test logs. We'll show your first-pass yield, RTY and control charts in a live demo.
See my yield in a demoSee the Hospitality ERPSix steps to go live.
What changes once every test result is in one place.
Losses seen by station, fixed at the source.
Every module binned on its measured power.
Drifts caught before they become failures.
Test records by serial, on request.
From one test bay to a multi-plant group.
One integrated system.
Services connected to quality and testing.
Answers for quality heads, test engineers and plant managers.
Software that collects every test result, from AOI and in-circuit tests to flash tests and burn-in, works out yields, flags drifts and links each result to the unit's serial number.
The share of units that pass a station the first time, without rework or retest.
First-pass yields of all stations multiplied together. Four stations at 97% each give about 88.5%, the real chance a unit gets through untouched.
A solar module is lit by a short, calibrated flash of simulated sunlight while its I-V curve is measured. Its maximum power sets the power class on the label.
Sorting modules into classes such as 545, 550 or 555 Wp by measured power, usually with positive-only tolerance so customers never get less than the label.
Statistical process control plots a measurement over time against control limits and flags patterns, such as a run of points on one side, before parts go out of spec.
Many electronic failures happen early in life. Running units under stress for hours weeds them out in the factory instead of at the customer.
Yes. Results are imported from test equipment by file or interface, mapped to stations and serials.
As an estimate, 4 to 8 weeks, depending on the number of testers and how they export data.
Tell us your products, test stations and current tools. We reply within 4 business hours.