⚙️ Oil & gas ERP: Asset management
Every pump, compressor, vessel and pipeline in one register, with live condition readings, maintenance plans set by risk, and statutory inspections that never slip past their due date.
Nine assets placed by likelihood and consequence of failure. Hover or tap an asset. Demo data.
Red cells get the shortest inspection interval.
Monthly maintenance cost for one compressor, in ₹ lakh, and days of downtime. Pick a strategy. Illustrative.
Days left on six statutory inspections. Anything under 14 days is raised as a work order. Demo data.
What each one asks of the maintenance team, and where it's handled.
Nine capabilities, each linked to the related module.
Send us your equipment list and last year's work orders. We'll show your risk matrix and inspection plan in a live demo.
See my assets in a demoSee the Hospitality ERPSix steps to go live.
What changes once every asset has a history and a plan.
Failures caught as readings drift.
Fewer emergency repairs and rush orders.
Inspections never slip past due.
Every test and repair on record.
From one wellsite to a full processing plant.
One integrated system.
Services connected to asset maintenance.
Answers for maintenance heads, integrity engineers and plant managers.
Keeping every piece of equipment, from wells and pumps to vessels and pipelines, safe and working for as long as it should, at the lowest total cost. Software holds the register, plans, inspections and history.
Using readings such as vibration, temperature and pressure to spot a failure developing, then fixing it before it breaks, instead of on a fixed calendar or after a breakdown.
Setting inspection frequency by risk: how likely a failure is and how bad it would be. High-risk items are inspected more often; low-risk items less.
Typical ones include PESO hydrotests for pressure vessels, OISD inspections for tanks, relief valves and fire systems, and Factories Act tests for lifting gear. We set up the list for your site.
Mean time between failures and mean time to repair. Together they show how reliable an asset is and how quickly it comes back.
Yes, through an integration with SCADA or a historian where available. Readings are linked to asset tags and drive alerts.
Work orders can require a permit to work before they start, linked to the HSE module.
Yes. Work orders, checklists, photos and readings on a phone, with offline use at remote sites.
As an estimate, 8 to 12 weeks for a facility, mostly spent building the asset hierarchy and maintenance plans.
Tell us your facilities, equipment count and current CMMS. We reply within 4 business hours.