🧩 Solar & electronics ERP: BOM management

One bill of materials, from design to the production line

Multi-level BOMs with live cost per unit and per watt, changes approved with their full impact in view, alternates ready before parts run out, and cell origin recorded for ALMM and DCR.

550 Wp module, cost roll-up₹0/Wp
0
0
Module cost₹0

Engineering change

See the impact before you approve

A junction box moves to Rev C. The ECO traces every product and order it touches. Press Run where-used. Demo data.

The change is waiting for approval.

Component lifecycle

Know which parts are going away

Parts on a 5 kW inverter control board, by lifecycle and how many approved sources exist. Hover or tap a part. Demo data.

Red needs action now: a last-time buy or a redesign.

Domestic content

Prove what went into every module

Share of module cost by part. Switch the cell source and see DCR eligibility change. Demo data.

How it works

From spreadsheets to one controlled BOM

Six steps to go live.

  1. Step 1Import BOMsFrom spreadsheets or CAD.
  2. Step 2Clean the part masterOne number per part.
  3. Step 3Add suppliers and pricesWith price breaks.
  4. Step 4Tag complianceOrigin, RoHS, BIS.
  5. Step 5Set up ECO approvalsWho signs what.
  6. Step 6Go liveNew builds on released BOMs.
What it changes

Results engineering and production notice

What changes once every build uses the released BOM.

Right parts on the line

Builds use the released revision only.

Costs you can trust

Quotes from live cost roll-ups.

Faster changes

ECOs approved in days, impact known up front.

Compliance proven

Domestic content backed by records.

Who it's for

Built for solar and electronics makers

From a single module line to a multi-plant electronics group.

  • Solar module manufacturers
  • Solar inverter and charge controller makers
  • EMS and PCB assembly companies
  • Battery and BMS makers
  • LED lighting manufacturers
  • Consumer and industrial electronics brands
Solar & electronics ERP

Other modules in the suite

One integrated system.

FAQ

BOM management questions

Answers for engineering, purchasing and production heads.

What is BOM management software?

Software that holds every product's bill of materials: the parts, quantities and sub-assemblies, with revisions, costs, alternates and compliance data, so purchasing and production all work from the same released list.

What is a multi-level BOM?

A BOM that nests sub-assemblies inside the product. An inverter BOM, for example, contains a control PCB, which has its own BOM of chips, resistors and connectors.

What is an engineering change order?

A controlled request to change a BOM, such as a new junction box revision. It shows where the part is used, open orders affected and stock to use up, then releases a new revision when approved.

What does where-used mean?

Searching from a part upward to see every product and assembly that contains it. Vital before changing or dropping a part.

How does the BOM help with ALMM and DCR?

Each cell and module part carries its manufacturer and origin, so you can show a module was built with listed cells and domestic content when a scheme requires it.

What are NRND and EOL?

Not recommended for new designs and end of life: signs a component will soon be unavailable. Last-time-buy dates and approved alternates keep production running.

Can it import BOMs from CAD tools?

Yes. BOMs can be imported from design tools as CSV, Excel or IPC formats, mapped to the part master.

Does it calculate cost per watt?

Yes, for solar products. Cost per unit is divided by rated power to give cost per watt, updated as prices change.

How long does implementation take?

As an estimate, 4 to 8 weeks, mostly spent cleaning the part master and importing BOMs.

Get In Touch

Ready for one BOM everyone builds from?

Tell us your products, part count and current tools. We reply within 4 business hours.

⏰
Response TimeWithin 4 business hours (your timezone)
Trusted by clients worldwideIndia · Australia · Fiji · Globally
15+Years of expertise
500+Projects delivered
3Countries served
✓ Free consultation✓ Reply in 4 business hours✓ NDA on request
Send Us a Message