🧩 Solar & electronics ERP: BOM management
Multi-level BOMs with live cost per unit and per watt, changes approved with their full impact in view, alternates ready before parts run out, and cell origin recorded for ALMM and DCR.
A junction box moves to Rev C. The ECO traces every product and order it touches. Press Run where-used. Demo data.
The change is waiting for approval.
Parts on a 5 kW inverter control board, by lifecycle and how many approved sources exist. Hover or tap a part. Demo data.
Red needs action now: a last-time buy or a redesign.
Share of module cost by part. Switch the cell source and see DCR eligibility change. Demo data.
What each one asks of engineering, and where it's handled.
Nine capabilities, each linked to the related module.
Send us one product's BOM spreadsheet. We'll load it as a multi-level BOM with costs and where-used in a live demo.
See my BOM in a demoSee the Hospitality ERPSix steps to go live.
What changes once every build uses the released BOM.
Builds use the released revision only.
Quotes from live cost roll-ups.
ECOs approved in days, impact known up front.
Domestic content backed by records.
From a single module line to a multi-plant electronics group.
One integrated system.
Services connected to product data and manufacturing.
Answers for engineering, purchasing and production heads.
Software that holds every product's bill of materials: the parts, quantities and sub-assemblies, with revisions, costs, alternates and compliance data, so purchasing and production all work from the same released list.
A BOM that nests sub-assemblies inside the product. An inverter BOM, for example, contains a control PCB, which has its own BOM of chips, resistors and connectors.
A controlled request to change a BOM, such as a new junction box revision. It shows where the part is used, open orders affected and stock to use up, then releases a new revision when approved.
Searching from a part upward to see every product and assembly that contains it. Vital before changing or dropping a part.
Each cell and module part carries its manufacturer and origin, so you can show a module was built with listed cells and domestic content when a scheme requires it.
Not recommended for new designs and end of life: signs a component will soon be unavailable. Last-time-buy dates and approved alternates keep production running.
Yes. BOMs can be imported from design tools as CSV, Excel or IPC formats, mapped to the part master.
Yes, for solar products. Cost per unit is divided by rated power to give cost per watt, updated as prices change.
As an estimate, 4 to 8 weeks, mostly spent cleaning the part master and importing BOMs.
Tell us your products, part count and current tools. We reply within 4 business hours.