🔎 Solar & electronics ERP: Component traceability
Every module and board linked to its supplier lots, machines, tests and customer. Trace backward from a field failure or forward from a bad lot, and prove cell origin for ALMM and DCR in seconds.
A junction box lot fails a supplier test. How many modules come back depends on what you can trace. Demo data.
Each step adds its record to the module's history. Hover or tap a step.
For DCR, the cell step proves an Indian, ALMM-listed maker.
A stream of scans from one plant shift. Demo data.
What each one asks of your records, and where it's handled.
Nine capabilities, each linked to the related module.
Send us one product's routing and a sample of lot labels. We'll trace a serial back to its suppliers in a live demo.
See my genealogy in a demoSee the Hospitality ERPSix steps to go live.
What changes once every serial knows what's inside it.
Only the units with the bad lot.
Customer questions answered on the call.
DCR records ready for any audit.
Field failures traced to their source.
From one line to a multi-plant group with suppliers.
One integrated system.
Services connected to traceability and quality.
Answers for quality heads, plant managers and compliance teams.
Recording which parts and lots go into each product, where and when it was made, how it tested and where it was shipped, so you can follow any unit backward to its suppliers or any lot forward to its customers.
The full family tree of one serial number: its sub-assemblies, component lots, machines, operators and test results.
Lot traceability tracks batches of parts. Serial traceability tracks each unit individually. Most makers use serials for finished goods and lots for components.
If a supplier lot is bad, forward tracing finds only the units built with it, instead of recalling everything made in that period.
Each module serial links to the cell lots inside it and their maker, so you can show a module was built with listed Indian cells when a project or audit asks.
Barcode or QR scanners, or phones with a scanning app, at the stations where parts are consumed. Label printers for serials.
Yes. A supplier portal or file upload brings lot numbers and certificates in before goods arrive.
Yes. Installers can scan serials at installation, linking each module to its site for warranty and service.
As an estimate, 6 to 10 weeks, depending on the number of stations, labelling changes and supplier lot data.
Tell us your products, volumes and current labelling. We reply within 4 business hours.