🔆 Solar & electronics ERP: Project installation
Size and quote a system in minutes, track every DISCOM and PM Surya Ghar step, send crews with the right kit, prove each install with photos and serials, and watch every site's generation after handover.
A typical 3 kW subsidy project, by stage. The waiting is mostly outside your team, so tracking it matters. Hover or tap a stage. Demo data.
Kit list built from system size. Change the size and watch the kit update. Illustrative quantities.
Last month's performance ratio by site. Under 70% raises a service ticket. Hover or tap a site. Demo data.
What each one asks of the project team, and where it's handled.
Nine capabilities, each linked to the related module.
Send us five recent projects. We'll show them from survey to subsidy, with kits and generation, in a live demo.
See my projects in a demoSee the Hospitality ERPSix steps to go live.
What changes once every project runs from survey to subsidy in one place.
Days off every project, from survey to net meter.
No return trips for missing parts.
Documents complete before they're asked for.
Generation tracked and issues caught early.
From rooftop installers to utility-scale EPCs.
One integrated system.
Services connected to solar projects.
Answers for EPC owners, project managers and installers.
Software for solar installers and EPCs that runs each project from lead to subsidy: sizing and quotes, site surveys, DISCOM and scheme applications, material kits, crews, commissioning and generation monitoring.
From monthly electricity use. In much of India 1 kW of panels makes roughly 1,300 to 1,500 units a year, so yearly use divided by that gives a starting size, limited by roof area and sanctioned load.
For homes, about ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000. Check the scheme portal for current amounts and eligibility.
Yes. Each state's steps and documents are set up, and every project shows where it stands and what's pending.
From system size and product choices, the system builds the kit list: panels, inverter, structure, cables, distribution boxes and earthing, and reserves it from stock.
Yes. A phone app records survey details, photos, serials and checklists, with location and time stamps.
Actual generation divided by what the system should make for the sunlight it received. Well-run rooftop systems often sit around 75% to 85%.
Where inverter makers offer data access, generation can be pulled in automatically by site.
As an estimate, 3 to 6 weeks, depending on states covered and data to import.
Tell us your projects a month, team size and current tools. We reply within 4 business hours.