⏳ Foundry ERP: Sand management
Moisture, compactability, strength and permeability tested and charted by shift, bentonite and water worked out per mix, new and reclaimed sand tracked, and every sand defect traced back to the tests behind it.
Results every two hours on moulding line 1. Pick a property. Points outside limits turn red. Demo data.
A line moulding 80 t of sand an hour. Move the sliders for core sand and reclamation. Estimates.
Sand-related rejects last month. Click a defect to see the sand property most often behind it. Demo data.
What each one asks of your sand plant and moulding teams, and where it's handled.
Nine capabilities, each linked to the related module.
Send us a month of sand test results. We'll show control charts, additions and defect links in a demo.
See my sand plant in a demoSee the Hospitality ERPSix steps to go live.
What changes once every sand test, addition and reclaim run is recorded.
Fewer out-of-limit results.
Blowholes and scabs down.
Bentonite used only as needed.
More reclaimed and reused.
From hand moulding to high-pressure moulding lines.
One integrated system.
Services connected to sand.
Answers for foundry owners, sand plant in-charges and quality heads.
Software for the sand plant that records sand tests, tracks additions, new sand and reclamation, and links sand quality to casting defects.
Moisture, compactability, green compression strength, permeability, active clay, LOI, volatiles and grain fineness, at the frequency you set.
Each result is plotted against limits. Drifts show before sand goes out of range, and alerts go to the sand plant in-charge.
Yes. From active clay and moisture results it works out bentonite, coal dust and water to add per mix, using your own factors.
Yes. Reclaimed sand quantity and quality are recorded, along with new sand added and spent sand sent out.
Yes. Core sand mixes, resin use and cores made are recorded, and core sand entering the system is estimated.
Where testers or mixer controllers export data, results come in directly. Otherwise lab staff enter them on a tablet.
Defects recorded in casting QC carry the line and shift, so the matching sand tests are shown alongside.
As an estimate, 3 to 6 weeks, depending on lines, tests and instrument links.
Tell us your moulding lines, sand system and how tests are recorded today. We reply within 4 business hours.