🏭 Building material ERP: Batch production
Mix designs by grade, batch tickets with target and actual weights straight from the plant controller, material variance and batch cost, line capacity planning, and a trace from any bag or truck back to its raw materials.
One 6 m³ batch of M25 with a ±2% tolerance on aggregates and ±1% on cement and water. Run a batch to see the plant's weights. Demo data.
A cement grinding line from clinker feed to dispatch. Raise the planned output and watch for the first stage to run out of room. Illustrative capacities.
Choose a batch to see its raw material lots and test results. Demo data.
What each one asks of your production and QC teams, and where it's handled.
Nine capabilities, each linked to the related module.
Send us your mix designs and a week of batch reports. We'll show batching, yield and traceability in a demo.
See my production in a demoSee the Hospitality ERPSix steps to go live.
What changes once every batch is planned, weighed and traced in one system.
Weights within tolerance.
Variance caught daily.
Answers in minutes.
Per tonne or m³.
From one plant to a national dealer network.
One integrated system.
Services connected to production.
Answers for plant heads, production managers and QC.
Software that plans production, holds mix designs, records every batch's target and actual weights, tracks material use and cost, and links each batch to its raw materials and tests.
Yes. Most batching controllers and PLCs can share batch data by database, file or API, so weights don't need retyping.
Yes. RMC batches by m³ and delivery ticket, and cement and other products by tonne, bag and lot.
Each grade has an approved recipe with tolerances. Changes go through QC approval and are versioned.
The difference between what a batch should have used by the recipe and what it actually used. It shows waste, weighing errors and moisture effects.
Yes. From a bag code or delivery ticket you see the batch, raw material lots, test results and dispatches.
Yes. Material at actual rates plus power, labour and overheads per unit.
Yes. Orders and stock levels drive the production plan by line and shift.
As an estimate, 6 to 10 weeks, depending on plant integration and the number of products.
Tell us your plants, products and batching or process setup. We reply within 4 business hours.