🧮 Printing & packaging ERP: Job estimation
Board, ink, plates, press time, lamination, die-cutting and wastage, costed from live prices and your own machine rates. Imposition worked out for you, price breaks in one go, and every quote checked against the job's real cost.
Carton blanks on a 28 × 40 inch sheet, with 3 mm gaps and a 12 mm gripper. Change the blank size and watch the layout.
Price per carton at different quantities, from the same estimate. Fixed costs spread thinner as the run grows. Hover or tap a point.
Last month's jobs: quoted cost against actual cost from the floor. Hover or tap a job. Demo data.
What each one asks of estimating, and where it's handled.
Nine capabilities, each linked to the related module.
Send us three recent quotes. We'll rebuild them with your machines and rates in a live demo.
See my quotes in a demoSee the Hospitality ERPSix steps to go live.
What changes once every quote uses live costs.
Not a day of spreadsheet work.
Every estimator, same rules.
Costs from live prices, not last year's.
Faster, clearer quotes win more jobs.
From a commercial print shop to a multi-plant packaging group.
One integrated system.
Services connected to print sales and costing.
Answers for owners, estimators and sales teams.
Software that works out what a print or packaging job will cost and what to charge: material, plates, press time, finishing, wastage and margin, then produces the quote.
The blank size, including bleed and gripper, is fitted onto the press sheet in rows and columns. More ups means fewer sheets and less board per unit.
Sheet area in square metres times GSM, divided by 1,000, gives kilograms per sheet. Multiply by the price per kilogram.
Plates, dies and make-ready are fixed costs. Spread over more units, they add less to each one.
Yes. One estimate can show price breaks, for example at 10,000, 25,000 and 50,000 units.
Yes. Set-up waste and running waste are added per process, so the sheet count covers what the floor really uses.
Yes. After a job is done, actual material and machine time are compared with the estimate, so rates can be corrected.
Yes. Each line carries its HSN or SAC code and rate, ready for the invoice later.
As an estimate, 3 to 6 weeks, mostly spent loading machines, materials and templates.
Tell us your presses, products and how you quote today. We reply within 4 business hours.