🛢️ Oil & gas ERP: Production reporting
Meter readings, tank dips, well tests and downtime go in once. The daily production report, allocated volumes by well, decline forecasts and monthly returns come out of the same numbers.
Each well's theoretical rate comes from its last test. Move the fiscal meter reading and watch the volume shared back. Demo data.
An Arps hyperbolic forecast from 2,400 bbl/d over five years. Change the initial decline and the b-factor. Illustrative.
Production lost against potential, by cause, with the cumulative share. Hover or tap a bar. Demo data.
Two causes account for most of the loss. Fix those first.
What each one asks of the production team, and where it's handled.
Nine capabilities, each linked to the related module.
Send us a month of well tests and meter readings. We'll run your allocation and daily report in a live demo.
See my field in a demoSee the Hospitality ERPSix steps to go live.
What changes once field data flows straight into reports.
No overnight spreadsheet work.
Wells add up to the fiscal meter.
Deferment by cause, not a guess.
Regulatory reports from the same data.
From a single marginal field to a multi-block portfolio.
One integrated system.
Services connected to upstream operations.
Answers for production engineers, operations heads and finance.
It collects field data such as meter readings, tank dips, well tests and downtime, and turns it into the daily production report, monthly volumes by well and regulatory returns.
The fiscal meter measures what the field actually sold. Allocation shares that volume back to each well in proportion to its test-based potential, so well numbers add up to the meter.
Measured fiscal volume divided by the sum of theoretical well volumes. A factor far from 1 points to stale tests, meter drift or losses.
Gross liquid times one minus the water cut, then corrected for temperature and pressure to standard conditions.
Barrels of oil equivalent. Gas is commonly converted at 6,000 standard cubic feet to one barrel, so oil and gas can be added up.
Fitting a curve, usually Arps exponential or hyperbolic, to a well's production history to forecast future rates and remaining reserves.
Yes, through an integration with SCADA or a historian where available, with manual entry by field apps where it isn't.
Monthly returns can be generated in the formats your contract requires. We confirm the exact formats with you during setup.
As an estimate, 6 to 10 weeks for a field, depending on the number of wells, sources and allocation rules.
Tell us your fields, wells and current reporting tools. We reply within 4 business hours.