🏭 Dairy ERP: Production & packaging
Fat and SNF balanced for every product, pasteuriser temperatures logged straight from the PLC, yields tracked for paneer, curd and ghee, packing lines counted, and batches released only after QA says yes.
An HTST pasteuriser over one hour. Switch on a heating fault to see the divert valve send under-heated milk back. Demo data.
Pick a product to see output, by-products and yield. Move the milk fat to see the change. Typical yields.
Today's batches and their checks. Batches move to Released as tests clear. Demo data.
What each one asks of your production and QA teams, and where it's handled.
Nine capabilities, each linked to the related module.
Send us a week of plant data. We'll show fat balance, pasteuriser records and product yield in a demo.
See my plant in a demoSee the Hospitality ERPSix steps to go live.
What changes once every litre, batch and pack is tracked.
Milk standardised exactly.
Losses found by batch.
Only tested batches ship.
Pasteuriser and CIP records.
From one chilling centre to thousands of village societies.
One integrated system.
Services connected to dairy production.
Answers for plant heads, production managers and QA.
Software that tracks milk from the silo through standardisation, pasteurisation, processing and packing, records yields and batches, and releases only tested products.
Adjusting milk's fat (and SNF) to the product's target, by separating cream or adding it back. The system works out the quantities.
Yes. Temperatures, hold times and divert valve events can come straight from the PLC, with alerts if limits are missed.
Pouch milk, curd, buttermilk, paneer, butter, ghee, ice cream, milk powder and others, each with its own recipe and yield.
Inputs of milk, fat and SNF are compared with the product made, so losses show up by batch and shift.
Yes. Packing lines record packs made, rejects and film use, and print batch and use-by details.
A batch is held until its tests pass and QA approves it, then it can be dispatched.
Yes. Milk, fat, packing, power and labour costs give cost per litre or kg.
As an estimate, 6 to 10 weeks, depending on products and PLC integration.
Tell us your plant capacity, products and packing lines. We reply within 4 business hours.